Addressing Issues arise before setup Charging Station.

27 June, 2022

System of DevOps strategies before set up  PCS .

We had addressed following issues for many clients and implemented them before starting  to set up a Fast Public  EV charging                      Stations ,conducive to operational expenses  & Brand building.

1.Set up a new fast charging station at new site( Bare land on Highway), requires as much as 8 Approvals & NOCs. Fresh sites on Highways may require many approval & NOCs. Some time cost of such approval , fees & liaison  equals to set a Fast charging stations at existing commercial space  of Plaza, office Building, parking of QSR etc.}

  1. We recommends Strategies that requires less expenditure on statutory fees & liaison, so that amortization of such expenses burdens minimum on operational expenses.
  2. Viability must be concurrent with Brand-Building ,Fast charging , rates uninterrupted & attractive amenities services.
  3. Best option picking up out of available matrix of Fixed , variable, dynamic rental/ lease with different working Business Model.
  4. Suitably utilising In-bound Power Amperage-extraction system without hurting existing business for DCFC.
  5. Selecting Location criteria to match with Sepc of DCFC Sync with present & Future Ev cars, specially abundant & popular EVs.
  6. Extricating from difficulties arises selecting Power Management Equipments sync with present & futuristic DCFC with a vision to justifies CapEx thereon.
  7. Long term vision with Min. cash flow [also min. PVFC] on provisions link to max DevOps Viability.
  8. Deciding well before( even before apply for approval ) ,the spec & Denomination of DCFC to achieve Max Fin-Tech efficacies.
  9. Prudently decide (visualize) well before the next expansion (vertical) knowing LiB -Size & C- rates of up coming EVs.
  10. CapEx on provision laying at beginning ,that save cost up to 30% on power Mgt-Equipments.
  11. Capital( PVFC) will be saved by making provisions set aside made for next two expansion of Fast Chargers.

13.Required level of net based OCPP  net API App based sync working of payment gateway and all seamless operations .

14.Charging stations must have all Amenities viz AC Customer lounges, On-site cameras, public conveniences, valet charging, Fast food counters, Resting couch ,additional lighting ,security for gentry & belongings at night.

Leave A Comment